Services

Energy Studies

Find out exactly why your CFE bill carries a power factor surcharge — and what it will take to turn it into a bonus.

An energy study pays for itself on the CFE bill

Most plants with motors, compressors, welders, and drives pay a monthly power factor surcharge to CFE without knowing it. Our energy study measures how your plant actually uses electricity, shows what that is costing you, and sizes the correction — so you only invest in what will pay back.

Who this is for

Plant, maintenance, and finance managers of facilities that:

  • Are billed by CFE in medium or high voltage (e.g. GDMTO, GDMTH, DIST, DIT)
  • See a power factor surcharge (“cargo por factor de potencia”) on the bill
  • Run many motors, compressors, pumps, chillers, or welders
  • Are adding load or new production lines
  • Have capacitor banks that may no longer be working
  • Want verified numbers before approving an investment

The problem on the CFE bill

CFE expects your plant to operate with a power factor of at least 90%. When inductive loads such as motors pull the power factor below that level, CFE adds a percentage surcharge to the bill. When the power factor is above 90%, CFE grants a small bonus instead. Because the adjustment is a percentage of the bill, a low power factor costs more every month the plant grows.

Power factor surcharge and bonus examples

CFE’s formula: below 90%, surcharge = 3/5 × (90 ÷ PF − 1) × 100 (max. 120%). At or above 90%, bonus = 1/4 × (1 − 90 ÷ PF) × 100 (max. 2.5%).

Power factorAdjustmentOn a $500,000 MXN bill
75%Surcharge 12.0%+$60,000
80%Surcharge 7.5%+$37,500
85%Surcharge 3.5%+$17,647
90%No adjustment$0
95%Bonus 1.3%−$6,579
100%Bonus 2.5%−$12,500

Examples for illustration. Your study calculates the real figures from your bills and measurements.

What we measure

We install calibrated power quality analyzers at the main service and key loads, typically over a full production cycle, to record:

  • Active, reactive, and apparent power (kW, kVAR, kVA)
  • Power factor by hour and by shift
  • Demand peaks
  • Voltage levels and imbalance
  • Harmonic distortion (THD)
  • Condition of existing capacitor banks

What the study is not

The study is not a sales visit and does not commit you to buy a capacitor bank. It is not a general energy audit of lighting or HVAC, and it is not a replacement for CFE’s own meter readings. It is an engineering measurement of your power factor problem with a clear recommendation — including when the right answer is not to install equipment.

What the client receives

  • A written report with the measured data and graphs
  • Your current power factor and what it costs per month
  • The recommended correction, sized in kVAR
  • Harmonic findings and whether detuned (filtered) banks are needed
  • Estimated savings and payback period
  • A lowest-cost proposal, if equipment is justified

What the client must provide

  • The last 12 CFE bills
  • Single-line diagram, if available
  • Safe access to the main switchgear and transformers
  • A contact from maintenance during installation of the meters
  • Information on planned load changes

Typical times

Times depend on the size of the plant and the production cycle we need to capture. We confirm the measurement period, report date, and any shutdown windows in the study agreement before we start.

Power factor calculator

Get a quick estimate from one month of your CFE bill. Use the kWh and kVARh shown on the bill; add the maximum demand (kW) to estimate the size of the correction.

Power factor calculator

Enter the values from one month of your CFE bill.

Estimate only, using the standard CFE power-factor formula (90% threshold). A site study confirms the real values.

Request your study

Send us your contact details and, if you can, a recent CFE bill. An engineer will contact you to confirm whether a study makes sense for your plant.

What do you need?
Does your CFE bill show a power factor surcharge?

Allowed: PDF, JPG, JPEG, PNG. Max 10 MB.

StagingFor testing only · Changes here do not affect the live site×